 |
| Fitting the tank into the leading edge was more "fun" than most people should ever have. The tanks were in and out no less than a dozen times each. |
| | |
|
| | |
 |
| This is probably the trickiest part of the project so far. This involves cutting the upper and lower curves of the wing tip at a 45° angle. The second one was definitely easier than the first. |
| | |
|
| | |
 |
| I wanted a heated pitot tube. Thanks to White Industries in Bates City, Mo. |
 |